Cambridgeshire County Council is having to consider how to remedy a number of serious faults with the guided busway.
Some relate to shrinkage and heavage of clay affecting the foundation of the busway. Others concern dropping of the end of the concrete beams.
BAM Nuttall is said to have rectified a fault that required buses to slow to 5mph at Histon in the summer.
But regular travellers on the busway will be aware that buses still traverse some bad sections of track a short distance east of Histon.
Read Cambridge News article here.
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
Showing posts with label foundations. Show all posts
Showing posts with label foundations. Show all posts
Sunday, 13 October 2013
Subscribe to:
Posts (Atom)