Showing posts with label service A. Show all posts
Showing posts with label service A. Show all posts

Saturday, 28 November 2020

Jesus Lane closure, Sun 29th Nov

The outbound A service will be unable to serve the Jesus Lane stop on Sunday 29th November, due to road works in Bridge St. The inbound service is already diverted, so is unaffected.

Although there's no information about this on the Stagecoach website, the usual diversion in this situation is via Victoria Avenue and Chesterton Lane, so that the Shire Hall stop can still be served.

Wednesday, 28 October 2020

Vandalism at Trumpington

Stagecoach have reported two attacks in recent days on Busway vehicles in the Trumpington area.

The first incident took place at Foster Road in the late afternoon of 17 October. Stagecoach report that children smashed a window. And just yesterday, at around the same time, a vehicle suffered two broken windows when it was the subject of criminal damage by what Stagecoach describe as "youths".

Fortunately, there were no injuries on either occasion, although the vehicles concerned had to be removed from service.

Tuesday, 25 August 2020

Bank Holiday Monday, 31 August

Stagecoach will be running a Sunday service on the forthcoming August Bank Holiday Monday. Nothing unusual in that, of course. But do remember that new timetables will be in operation. For the most part the changes to the Sunday timetable are only minor. But that's not the case if you use Cambridge North, live in Orchard Park, or are accustomed to using the Godmanchester services (you'd be better to consider the Whippet X3 in future for this last if you want to travel into Cambridge).

Whippet will also be running a Sunday service, with the U continuing to extend to/from the Biomedical Campus (but note that the Outpatients stop remains suspended).

Saturday, 22 August 2020

Major changes to routes and timetables from 30 August

Stagecoach have announced some major changes to Busway services from 30 August. Full details, all new/revised timetables, and a route map, are on the Stagecoach website. What follows is a summary.

There are two main changes:

Busway-fitted vehicles will, in future, operate only on the Busway, also between St Ives Park & Ride and either Marley Road or Hinchingbrooke Hospital, and - within Cambridge - between the two sections of the Busway. This means that Busway vehicles will no longer provide feeder services to the rural areas beyond St Ives or to Peterborough and Royston. Rural connections will be provided by new services V1-V4 (serving, respectively, Ramsey, Chatteris, Somersham and Boxworth), operating a similar service to the existing "through" workings, but requiring passengers to change at St Ives. Would-be passengers should note that Stagecoach do NOT guarantee these connections, which could be an issue for commuters heading home in the afternoon, as these are the last services of the day to these destinations. There's also a new service V5 providing a an early-morning service from Godmanchester and late-evening return journeys - but these will operate through from Cambridge (as a "B" as far as Hinchingbrooke Hospital), so no change of vehicle will be required. Peterborough will be served by service 904 from St Ives - this will operate via Houghton village, but otherwise follow the main road between St Ives and Huntingdon and not divert via the estates (which will continue to be served by route B). In a reversion to earlier practice, Royston will be served by a separate Royston/Cambridge service, the newly-established 915.

The A and B routes are being switched. In line with the revision originally planned for March (but not implemented at the time), the A will in future operate via Shire Hall (although, because of the Histon Road closure, Cambridge-bound journeys will travel via the Science Park for the next year or so). The B will serve Cambridge North station. The A (single-decker buses) will continue to serve the main Railway Station and the Biomedical Campus, whilst the B (double-deckers) terminates in Cambridge City Centre.

And, just to note, services D and R will cease completely from 30 August (the R has been suspended since the early days of the pandemic).

Finally, a reminder that maps and timetables, and more detailed explanations of the changes, are on the Stagecoach website

Saturday, 6 June 2020

Changes from 14/15 June

Important changes from 14/15 June.

1, Stagecoach timetable changes (from 14 June)
The R remains suspended. There are more frequent services on routes A, B & D. Click here for more information, and here for the new timetables.

2. Concessionary pass holders (from 15 June)
The County Council is removing the temporary exception that allowed concessionary pass holders to travel before 0930 Mon-Fri. If you need to use the bus to access one of the early morning supermarket slots reserved for the elderly you'll have to pay to use the bus to get there (and possibly back).

3. Face coverings (from 15 June)
Face coverings will be compulsory on all public transport from 15 June.

There is reduced capacity on buses as a result of physical distancing requirements.

Saturday, 9 May 2020

Stagecoach timetable changes from 10 May - southern section

Stagecoach are making further changes to the Busway timetable - this time affecting only the southern section of the Busway. I'm guessing that the continuing lack of traffic within Cambridge city means that schedules can be further accelerated (and long may that continue, if not the underlying reason...).

So, from Sunday 10 May, buses will operate 5 minutes earlier from Cambridge rail station through to Trumpington Park&Ride and Royston. In the opposite direction, buses will start 7 minutes later and run 7 minutes later throughout between Royston/Trumpington Park&Ride and Parkside.

The latest version of the temporary Busway timetable is available here

Thursday, 2 April 2020

Stagecoach timetables from 5 April

Further significant shrinkage of Stagecoach's Busway services will take place on Sunday 5 April.

In addition to timetable changes, there are route changes. And it's worth noting, in particular, that Pine Hills, Brampton and Buckden will no longer be served (although the 66 provides an alternative service for the last two of these).

The list of changes is too extensive to document here. Instead, if you need to travel, there is a full explanation on the Stagecoach website.

And you can download a copy of the temporary timetable here,

Saturday, 21 March 2020

Busway reopens 30 March - but with temporary timetables

At last! The "temporary" diversion, avoiding the Busway A14 overbridge, is finally going to be lifted, and services will revert to their original routes on Monday 30 March. This will be particularly important for Orchard Park passengers, who have been using the "wrong" stops for 9 months.

However, as previously mentioned, the introduction of Stagecoach's improved Busway timetables has been postponed for a second time. Instead - and for reasons that don't need spelling out here - a reduced service will be introduced on that date. What Stagecoach term an "enhanced Sunday service" will operate Monday-Saturday. It's not quite as bad as that makes it sound - there are certainly additional peak-hour services, and the evening journeys have been retained as well. Service R will be suspended. Sunday services continue unchanged.

Full details, including links to the temporary timetables, are available on the Stagecoach website.

Thursday, 5 March 2020

New bus timetables

The timetable changes planned for March 29 will now happen on an as yet unspecified date (although the timetables themselves are currently available for viewing on Traveline). See the revised announcement from Stagecoach:

https://www.stagecoachbus.com/promos-and-offers/east/busway-service-changes-spring-2020-facts-and-questions

There’s going to be a huge shake up of Stagecoach’s busway services starting from 29th March. Full details at

https://www.stagecoachbus.com/media-library/files/east/busway_-_we_re_adjusting_our_timetables_-_leaflet_website.pdf?la=en



Tuesday, 18 February 2020

New timetables - postponed!

Stagecoach had been planning to introduce new Busway timetables on 1 March (following on from last year's consultation, and the acquisition of additional vehicles). Although the intended timetables are now available to view on Traveline, the rather more important piece of news at this stage is their introduction has been postponed to "an as yet unspecified date". This date will presumably be the one when Highways England and Cambridgeshire County Council finally manage to reopen the stretch of Busway between Histon and Orchard Park. Anyone like to hazard a date for this (I feel I should offer a box of chocolates for the most accurate estimate...)?

Monday, 10 February 2020

Busway diversion extended YET AGAIN!

Some of those who read this blog may be old enough to remember the time before the Busway was closed between Histon and Orchard Park whilst Highways England worked on the A14 overbridge. Others will simply be too new/young to remember that time.

Well, guess what? The closure (and resulting diversion) is set to continue. According to Highways England: "The new anticipated re-opening date is early March." Keep that date in mind, and we can all return to it in, say, 3 weeks time.

Whilst it's Highways England that is responsible for the never-ending closure - and for preventing Stagecoach introducing new timetables (originally planned for 1 March, but presumably delayed until the diversion is removed) - the County Council hardly covers itself in glory either. At the time of writing, the Council's dedicated Busway website still maintains the fiction that the Busway will reopen in "mid-January". Don't passengers deserve better information than that (the relevant page doesn't seem to have been updated since late-October)? What's happening to money that large-scale developers (e.g. of the Eddington site) are required to pay the County Council for Busway operation/promotion/management?

Full details of the further delay, and Highways England's sort-of-apology ("high-level discussions are taking place on a daily basis"...), can be found in a Cambridge Independent news item.

Saturday, 11 January 2020

Timetable changes from 13 January

[UPDATE 13 Jan, 0835. A friend spotted Stagecoach's announcement of the changes detailed below on the Stagecoach East "Promos and Offers" web page - yes really! That's the only place the information is provided - and it's less complete than my attempt below.

Here are links to: (a) the announcement, and (b) the new timetable.

Enjoy!]

======

I was taken by surprise at St Ives Station Road stop this morning to see a new departure sheet posted. I've checked both the Stagecoach and County Council Busway websites and can find no details of changes to services (or even a simple announcement). But new timetables are available from Traveline, and I've attempted below to identify the changes involved.

Note, first, that there are no changes to Sunday services.

As for the rest of the week (including Saturdays)... The most significant changes are to routes A and D. There seems to be a significant increase in journey times on the stretch between Orchard Park and St Ives town centre. How is this reflected in the timetable?

On city-bound trips, most services will depart St Ives 7 minutes (or thereabouts) earlier than at present, and operate 7 (or so) minutes earlier to Orchard Park. Thereafter timings seem unchanged.

On St Ives-bound trips, most services will depart from the city stops as at present, but after Orchard Park will run 7 (or so) minutes later than at present.

There seem to be changes to how the services are being organised in St Ives beyond the town centre. In addition to changes to the times of buses, there may be some switching of routes between the A and the D (and possibly changes to the routes themselves). Check the new timetable carefully!

The first Mon-Fri departure from Ramsey will be at 0605 (i.e. 15 minutes earlier than at present). Morning departures from other villages and towns into St Ives and Cambridge are 5-10 minutes earlier than previously.

There are changes to the routes taken by both services inside the Biomedical Campus. Southbound services will call at the Royal Papworth only as they leave the campus. Northbound services will call at the Royal Papworth only as they first enter the campus.

There are minor changes on route B, affecting - so far as I can see - only the indicative times at intermediate stops. So, for example, outbound services will notionally call at Shire Hall 3 minutes after leaving Drummer St, 2 minutes earlier than at present. (But this seems a pointless change, since it's rare for buses to arrive by the indicative time even on the 5-minute schedule, so why they're any more likely to reach the Shire Hall a full 2 minutes sooner defies logic!)

There seem to be no changes to services south of Trumpington, nor to route B services north of St Ives.

I apologise if I've missed something that's key to an individual reader's particular journey, but there was a lot of data to wade through. And I was aware that those of you heading off for your Monday commute might appreciate some advance warning.

(When I checked at 2300 on Jan 11 the new timetables were not available on the Stagecoach website, only from Traveline.)

Saturday, 9 November 2019

Busway diversions sometimes benefit

I'm pleased to offer a guest post, from Barry, a resident of Orchard Park. He notes that the current (rather long-term) diversion of Busway services does bring benefits to some people, offering.journeys that the "normal" timetable simply doesn't, at present provide.

Barry writes:

The Guided Busway between Histon and the junction close to Orchard Park West is now to remain closed until January.  Stagecoach apologise for the disruption, and indeed it is bad news for most passengers on the traditional A & D routes, who have longer journey times as the buses divert through Orchard Park.

It’s also bad news for people wanting to go to most of Orchard Park in the evening; no buses go through the estate after 9pm and the stop on Histon Rd that the evening B services call at is a long walk from Orchard Park East.  It's also unfortunate for anyone in Orchard Park wanting a direct bus all the way to Huntingdon or Peterborough.

Overall however, Orchard Park wins handsomely from this, and when things go back to normal the service we’ve enjoyed since the summer will be sorely missed.  Not only has our rush hour service more than doubled from 4 buses an hour to 10 (even before you consider that the diverted B’s still aren’t that far from the Orchard Park West stop), but we now benefit from direct services to the Science Park, Cambridge North Station, Cambridge Station, Addenbrooke’s, Trumpington & beyond.  I’ve used the bus more in the last 5 months than in the previous 5 years since I moved here, as the convenience of the bus now beats cycling to the stations!

Users of the B also benefit from a more direct journey into Cambridge (though they are a bit more at risk of congestion above J32 of the A14).

With the changes having become at least a medium term thing it’s a shame that the last three evening Bs weren’t rerouted via the Science Park so that they could have served Orchard Park too; I feel that more people would have benefited from it serving all the other stops north of the city centre instead of Jesus Lane and Shire Hall (and they might have found out that in fact more people than they think work late at the Science Park!!!).  It might not have seemed worth arranging for the initial two weeks, but for six months (or maybe more???) it could have been.

Perhaps when services return to normal will also be a good time to look at the location of the Orchard Park East stop, which is located only a few yards round the corner from where it could have been served by more than twice as many buses.
Thanks to Barry for sharing his thoughts.

What do you think?

Thursday, 31 October 2019

Busway diversion extended - softly, softly

Those with good memories will recall that, at the last count, the Busway between Histon and Orchard Park was due to reopen next Monday, 4 November.

Well, guess what? That's not going to happen! I bet that took readers by surprise. Or not.

Yesterday, the County Council quietly updated their online "News" item on the closure to announce that the track will now reopen in "mid-January". Will it? Only time will tell...

Friday, 16 August 2019

Further closure, 17-18 August

Another weekend, another closure. And another closure with little advance warning.

The Busway will be closed between Park Lane and Station Road, Histon. All day Saturday and Sunday. As a result, the northbound stop can't be served - outbound buses will pick up at Station Road Stores instead.

Here's a link to the County Council announcement.

Wednesday, 7 August 2019

Additional Busway closure August 10-11

Not content with the summer-long closure of the Busway between Histon and Orchard Park, this coming weekend (August 10-11) sees the closure extended to the Science Park. This means that Stagecoach A and D services won't be able to serve the Orchard Park, CRC and Science Park stops. No alternative is being provided for Orchsrd Park passengers (other than the existing "diversion" stops that service B uses on Histon Road). Alternatives for the other stops are on Kings Hedges Road (near the CRC) and at the Golden Hind (for the Science Park).

Here's the Stagecoach announcement relating to this latest closure.

Thursday, 4 July 2019

Busway closure/diversion period extended

My post of 17 June has been overtaken by events. Firstly, the County Council website did eventually get round to advertising the closure and associated diversion (but not until the day they started - so NO ADVANCE WARNING!). More importantly, what was previously two separate closure periods has now been transformed into one extended closure. But just when the closure ends is a matter of some confusion. According to the County Council the closure now carries on, uninterrupted, until 29 August. According to Stagecoach, the closure continues until the commencement of services on 1 September. According to the Cambridgeshire Live website, the closure is due to continue until 4 September. My interpretation of these varying dates is that the Highways Agency cannot be certain when the bridge works that are responsible for this closure will actually finish. All we know for certain is that they will continue for the next few weeks! Be prepared...

Monday, 17 June 2019

Forthcoming Busway closure/diversion - extended periods

The Busway will be completely closed between Histon and the Orchard Park "junction" (where the A/D and B/P usually diverge heading into the city) between the following dates:

22 June - 7 July inclusive
25 July - 3 September inclusive

Here's a link to the Stagecoach announcement which gives details of the necessary diversions and alternative stops. I presume the Whippet P will take the same diversion as the Stagecoach B.

There's nothing about this major closure on the County Council's Busway site.

Sunday, 29 July 2018

More details on busway timetable changes from 29 July 2018

The new timetable can be viewed on http://thebusway.info/pdfs/tt/ABNR.pdf

The new timetable is still not on the Stagecoach website, as at 29 July.

And a warning to passengers joining the busway at Drummer Street Bay 12, that the timetable poster displayed there is very out of date.

Once a day the service B operates via Houghton (18.55 Hinchingbrooke Hospital to St Ives).
In the other direction the 06.26 and 06.56 service A from St Ives to Hinchingbrooke call at Houghton.

Cambridge North continues to be served Mon-Sat by the hourly service N. Stagecoach seem to be missing an opportunity to provide a frequent direct service between St Ives and Cambridge North.

The Royston extensions of service A seems likely to introduce even more possibilities for late running on the core A route between Trumpington and St Ives.

Tuesday, 15 November 2016

Temporary diversion of bus route A

Due to roadworks causing traffic tailbacks, Stagecoach is diverting bus route A until 28th November.

Service A buses will not call at Parkside. Passengers should use the New Square stop instead.

Full details here.