Cambridgeshire County Council is suing BAM Nuttall for £31 million for repair of defects on the guided busway track. BAM Nuttall is the contractor which built the busway.
https://www.newcivilengineer.com/latest/cambridge-council-to-sue-bam-for-further-31m/10015672.article
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: only a member of this blog may post a comment.