Stagecoach will take advantage of the new West Huntingdon Link Road to re-route buses to/from Peterborough on service B, enabling them to serve Huntingdon Railway Station.
Details of the change of timetable, which will start from 1 September, can be found here.
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
Showing posts with label West Huntingdon Link Road. Show all posts
Showing posts with label West Huntingdon Link Road. Show all posts
Tuesday, 5 August 2014
Subscribe to:
Posts (Atom)