In an earlier post I mentioned that the railings where the cycleway crosses a floodwater culvert were still not in place. I am happy to report that the railings have now been erected.
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
Showing posts with label culverts. Show all posts
Showing posts with label culverts. Show all posts
Thursday, 15 December 2011
Monday, 31 October 2011
Progress on the cycleway
Over the past three weeks or so the main focus has been to construct a series of culverts to allow floodwater to pass under the cycle track and then under the busway a short distance east of the Ouse Viaduct.
9 October
16 October
22 October
30 October
9 October
16 October
22 October
30 October
Subscribe to:
Posts (Atom)