One of the contributors to this blog has commented recently on research being carried out into the engineering characteristics of the concrete beams, specifically mid beam cracking. This has been evident on the busway from very early on. This picture was taken in 9 October 2011 on the section between St Ives and Fen Drayton, where the track is supported on deep piles.
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.