The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
Showing posts with label guded busway. Show all posts
Showing posts with label guded busway. Show all posts
Monday, 17 October 2011
More on the cycle track
There is now a length of tar fro a few hundred metres just west of Swavesey, and pipes are being installed about half a mile east of the Ouse Viaduct to allow floodwater to pass under the cyce track.
Subscribe to:
Posts (Atom)