The Swavesey Half Marathon will be using part of the busway cycle track near Fen Drayton on Sunday 2 March 2014.
Details of the event, including a map of the route, can be found here.
http://www.cambridge-news.co.uk/Cambridge/Swavesey-Half-Marathon-run-confirmed-for-second-year-20140115050018.htm
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
I hope they have prepared another route for when the busway floods!!
ReplyDeleteI wonder if they've even thought about it! In fact, the section of the cycle track which the run will use is basically above water at the moment, but there's a lot of debris lying - bits of driftwood etc.
ReplyDelete