This afternoon the Maintenance / Cycle track is flooded right across to a depth of over 5cm (and rising) just to the east (Fen Drayton side) of the Ouse viaduct.
The gates are not yet closed, and warnings not yet in place.
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.