The busway cycle track between Histon and Orchard Park will close for a month while repairs are carried out. This is the section of busway affected by the A14 widening works, and has been closed to buses for half a year, with buses diverted meanwhile.
https://www.cambridge-news.co.uk/news/cambridge-news/cyclepath-guided-busway-a14-closure-17508409
The Cambridgeshire Guided Busway linking St Ives, Cambridge and Trumpington opened on 7 August 2011. This blog is now closed to new posts and comments. It was set up for people who travelled the busway, either as bus passengers, or users of the cycle/footpath such as pedestrians, cyclists and horse riders. The blog remains visible as a historic record. Many thanks to everyone who contributed to the blog over the past decade.
This ever-extending closure has seriously undermined the effectiveness of this Busway in reducing traffic congestion and chaos between Central Cambridge and the Huntingdon area. Surely HE know how long it takes to widen a pair of bridge abutments over and old railway when widening a highway?
ReplyDelete