Showing posts with label Cambrdigeshire. Show all posts
Showing posts with label Cambrdigeshire. Show all posts

Wednesday, 8 August 2012

Harrison Way congestion and bus connections to Huntingdon Railway Station

This week's Hunts Post (8 August) has two items about the busway.

First,  a piece entitled 'Ring road peak flow now smoother' (page 2). Engineers have changed the timings of the traffic lights at the Harrison Way/Busway crossing to reduce the number of times cars have to stop when both pedestrians and buses are at the junction.  It is worth noting that traffic is light at the moment because of the school holidays, and it remains to be seen how the new lights sequence will perform when traffic increases at the start of the school term.

Second, a letter from a Bluntisham resident about connectiosn between the busway and trains at Huntingdon Railway Station. It is a response to Philip Newell's comment last week on behalf of Stagecoach. The letter gives a couple of example of how the service B does not connect with trains.

Monday, 23 July 2012

New timetable, new bus stop

The new bus timetable  for Stagecoach service B began officially yesterday monring (Sunday 22nd), although the only change was that Cambridge-bound services were departing from the new stop  in Station Road rather than St Ives Bus Station. Well, that was the theory. In practice,  no new timetable information had been posted in the bus station, and there was nothing to direct passengers to the new stop. the 0840 bus called at Station Road, then looped round the bus station to pick up passengers there. I travelled to Cambridge on the 09.40, which also picked up atStation Road and the Bus Station.
Passengers boarding the first bus from the new, unfinished, Station Road bus stop (0840 Sunday 22 July).